Anglais (US)
A video will come about how to perform screenshots.
(Version 2.0)
Version 1.1:  calculus of Q fixed.
Example with a low power asynchronous machine:
Version 1.2:  some capacitors doubled in or order to get easy adjustment
Version 2.0:  => Energy counter added: 3 minutes to 3 days
                    => harware range forced to 10A when idle (for safe operation)
                    => screenshot possible during 'STOP'
                    => voltage spectrum as well as current spectrum
                    => resistance added in order to protect the 2.048V voltage ref
Example: charging a laptop...